Working through a stage checklist
Tick items off, skip the ones that don't apply with a reason, and see who did what.
In short
Each stage can have a Checklist: the things that must happen before the stage is really finished. Click the round tick next to an item to mark it done. If an item doesn't apply to this project, skip it and say why. Anyone in your organization can do both.
Where to find it
Open a project. On the Overview tab, the Stage pipeline lists every stage.
- The stage in progress shows its checklist open underneath it, with a summary line such as Checklist 3/5 done · 2 required open.
- Other stages show a small link after their name, such as Checklist 2/4 or 4 checklist items. Click it to open that stage's checklist, and click again to fold it away.
- A stage with no items yet shows Add checklist.
You can work on a stage's checklist before the stage starts. That's handy when a document arrives early.
Marking an item done
Click the empty circle next to the item.
It fills in blue with a tick, and a line underneath shows Done by your name and the time.
Made a mistake? Click the tick again to reopen the item.
Skipping an item that doesn't apply
Not every item fits every project. For example, a villa with no change to its electricity load needs no DEWA modification.
Open the item's ⋯ menu and choose Skip….
Type a short reason, for example No DEWA modification needed. A reason is required, so anyone reading later knows why it was left out.
Click Skip item.
The item is crossed out, with your reason shown under it in quotes and Skipped by your name and the time.
To undo it, choose Reopen from the ⋯ menu. Or click its circle to mark it done instead.
Required and optional items
| You see | What it means |
|---|---|
| Required tag | This item should be done or skipped before the stage moves on. |
| No tag | The item is optional. It never holds anything up. |
If you click Advance stage while required items are still open, Mabny stops and asks first. See If required checklist items are still open.
Whether an item is required is set in the stage templates, or by whoever added the item.
Changing the order
Open an item's ⋯ menu and choose Move up or Move down. The new order is the same for everyone.
What happens next
- Every tick, skip, reopen and change is recorded in the project's Activity, with who did it and when. Skip reasons are included.
- The number of required items still open shows on the Home page next to the project, for example 3 required open. See The Home page.
When a checklist can't be changed
A checklist is locked, and shows without tick buttons, when:
- its stage is completed,
- its stage was skipped. Its summary reads not counted, stage skipped, because the items were never needed, or
- the whole project is completed.